Tuesday, November 4, 2008
Sunday, October 19, 2008
Assignment 3 Drawings
Assignment 3 MODEL
Thursday, August 28, 2008
Assignment 1 Submission
INSERTION - THRESHOLD - INFRASTRUCTURE - MATERIALITY - RECIPROCITY
RECIPROCITY + INSERTION
[locating.signifigant.playing.fields + trace.of.existing.coogeeoval.geometry]
INFRASTRUCTURE + INSERTION
[spectator.line.of.sight + resident.views.relativeto.buildingheight = area.most.viewed]
INFRASTRUCTURE + THRESHOLD = RECIPROCITY
[mapof.existing.site.parking + pedestrian.access + public/private.vehicularflow.pattern = traceof.traffic.topography]
INFRASTRUCTURE + THRESHOLD
[summer/winter.use + summer/winter.human.distribution]
CONCEPTUAL MASSING MODEL
plan view of the model - with relationship the rugby club (white), existing infrastructure (grandstand, park and seating all black), and the new complex (coloured by use)
red-large gym
magenta - multipurpose rooms
dark purple - cafe and outdoor area
light purple - storage and media rooms
green - extension of existing park
light pink (under red mass) - office area
yellow - community hall
orange - changerooms/toilets/rubdown rooms
blue - foyer area
Elevation - as seen from the rugby field. entrance seen at the side of the grandstand. Red gym hall cantilevers above the outside area.
street view approaching from Coogee Shops
street view approaching from park side
treatment of the existing grandstand - new buildings to hug the grandstand and emphasise it.Sunday, June 15, 2008
PROJECT3# final drawings
plan views: ground floor rendered as a poche, first floor, second floor and roof
close up on rendered poche
section showing light quality within the whole gallery space (shows the difference between the well lit sunny courtyard and the gallery space) and a section focusing on the light quality created in the entrance room.
3 vignettes detailing the options for circulation on the ground floor: entrance way, sculpture steps and the courtyard.